Wednesday, 31 March 2010

Poinsetta Fay HD

Here she is finished. I started her Friday night and finished her this morning. I can now say, I have had my first Passione Ricamo HD woohoooooo. She was stitched on the recommended Polstitches Fabric Fallen Leaves 28ct. I left of the backstitching on the Flowers themselves, as I found that I liked them without it.
There is an update of Diamond coming soon, just been slow progress, but I am still enjoying her.

Tuesday, 23 March 2010

St Petey Part 5 So far..............

Here is St Petey Part 5 so far. I am really enjoying this one at the moment, I just love working with silks. I am currently filling in around the windows and should have them finished by the end of the week, then decide whether or not to scroll down (this pic should be the other way up) and do the bottom 4 or carry on at the top, so that I don't have to keep, scrolling up and down all the time.

I am also working on a HAED design called Diamond, which I am hoping to show a piccy off soon. Just a few more stitches before I finish the page I am on. I am starting at the bottom, so page 38 is half way, and I am loving this one too. I work on it at nights before I go to bed, and St Petey is worked on during the day til tea time.

Friday, 19 March 2010

HD no 4. HO HO HO, Lizzie Kate Xmas Special 2007

Here is HD no 4. This was lovely to stitch up. Am looking forward to doing the 2008 Special edition.
Onto Bluebell this weekend, and then back to St Petey on Monday. TFLxxxxx

Monday, 1 March 2010

Goals

Well Feb Goals weren't met, but that is because I haven't really stitched much this month. So Feb Goals

Work on St Petey, Finished Part 4
Finish Bluebell, Miss ThanksGiving and Ho Ho Ho - Not a chance lol. OH well never mind.

March Goals

Finish Part 5 and start part 6 on St Petersburg
Work on Bluebell,
Work on Miss Thanks Giving
Work on Ho ho ho

Think this will be easier. I am a bit disappointed that I didn't have a HD last month, but glad to see Part 4 of St Petey finished. Part 5 is going well, hope to have the top section done within a week or 2.